Friday, January 30, 2026

Port folio project week (1/26-2/1)

 




In order to manage a 7-8 week long project efficiently, me and my partner Oliver Romero agreed that we should make a schedule to make sure we dont fall behind. So we made one, (it is shown above). To break it down week 1 we just look through a variety of genres to make a good choice for our project. Week 2 (this week) we planned our schedule, made a project idea and we are finishing our story board. week 3 is based around filming. Week 4 we plan to edit our first draft, and analyze for mistakes. Week 5 we reflect on our mistakes and fix them. Week 6 we finish up with out editing, and the film opening, and week 7 we do our ccr. Week 8 we have as a buffer if we dont finish anything in time.



The resources we have accounted for which are needed are, a editing soft ware such as Clip champ. We will need a camera/ smartphone for recording, we will need paper for things like our schedule and story boards. We will need a location for our recording. We may need other resources for our Foley, as we plan to integrate some of our sounds.



 
We plan to stick to this schedule, and these resources, but we may make changes over time based on the needs of our project.


No comments:

Post a Comment

Links to project and CCRs

 Opening and CCR Link Blog Here are the final links: Film Opening: https://drive.google.com/file/d/1MXeGY5zEPm6MrLJiS8QCmisRJeGSYc5a/view?us...